This story contains some misinformation that the Sun should have verified before publishing.

First, because this project is partially funded by a federal grant, MDOT is the agency taking bids swarding the contract that includes a time line for completing the contract, not the Road Commission.
So other than securing the grant and providing engineering support, we have no input on scheduling. .

Second, Goslin Czubak does not provide construction services. Gosling Czubak was hired by the Road Commission to provide construction engineering support as we no longer have a professional engineer on staff. Another contractor was hired to do the actual construction. The contract was supposed to be awarded back in February but was delayed due to COVID.
We certainly can understand the frustration and ask for your patience.